Session Idle:  seconds.

General Search of Food Request Database. IR-4 Food Use Request.
This page includes all the trials related to the PR#.
      

Submit Supporting/Similar Request
PR#PriorityPesticide(MFG)Commodity (Crop Group)Project Status
13503 + FLUMICLORAC ( VALENT ) SESAME ( 20A = RAPESEED SUBGROUP ) MFG WILL NOT SUPPORT

Reduced Risk Status: THIS AI HAS BEEN CLASSIFIED AS RR FOR ONE OR MORE FOOD USES.
IPM Compatibility: PER REQUESTER: VERY GOOD FIT; THERE IS NOT A GROUP 14 HERBICIDE LABELED FOR USE IN SESAME, SO THIS PROVIDES A GREAT CHEMICAL ROTATION OPTION FOR GROWERS WHO HAVE 0 LABELED HERBICIDES FOR POSTEMERGENCE WEED CONTROL:08/22
Reasons for need: AMARANTHUS SPP., PARTHENIUM RAGWEED, COMMON COCKLEBUR, OTHER VARIOUS BROADLEAF WEEDS; THERE IS CURRENTLY NOT ANY LABELED HERBICIDES FOR POSTEMERGENCE BROADLEAF WEED CONTROL. WITHOUT ANYTHING LABELED, SESAME GROWERS ARE LOSING YIELDS DUE TO WEED COMPETITION;
Requesting State(s): MI:Henn, A ; OK:Ferguson, JC* ; SC:Cutulle, M ; TX:Matocha, M ;
PCR Use Pattern: RESOURCE; DOSAGE: 4-6 FL OZ/A, BROADCAST APPLICATION OVER-THE-TOP, 2 APPLICATIONS, RTI 45 DAYS; APPLY 4-6 FL OZ/A OF RESOURCE AT THE 4-LEAF PAIR GROWTH STAGE, WHERE A SECOND APPLIC CAN BE MADE AT MIS-BLOOM IF NECESSARY; DO NOT APPLY MORE TAN 12 FL OZ/A
EPA Default Residue Trials:
IR-4 Residue Trial Plan:
Residue Protocol Use Pattern:
Efficacy/Crop Safety (E/CS) Data Required:
E/CS Research Comments: IN THE 2023 PERFORMANCE PROTOCOL: TESTING 3 RATES (0.027, 0.04, 0.08 LB AI/A) OF FLUMICLORAC (RESOURCE) + ADJUVANT, IN AT LEAST 15 GPA, AND COMPARING 1 VS 2 APPLIC; FOR THE SINGLE APPLIC TRMTS, MAKE A POSTEMERGENCE FOLIAR BROADCAST APPLIC WHEN THE MAJORITY OF THE CROP IS AT THE 4 LEAF PAIRS OF SESAME STAGE; FOR THE TWO APPLIC TRMTS, MAKE A POSTEMERGENCE FOLIAR BROADCAST APPLIC WHEN THE MAJORITY OF THE CROP IS AT THE 4 LEAF PAIRS OF SESAME STAGE, FOLLOWED BY A 2ND POSTEMERGENCE FOLIAR BROADCAST APPLIC 45 DAYS LATER; EVALUATE CROP INJURY, WEED CONTROL AND CROP YIELD
Label Use Pattern Submitted To EPA:
EPA PIF Status: Orange 08/23
EPA Status:
EPA PRIA Date:
MRID:
Comments: EPA HOLD CAUTION:08/23; at 2022 FUW, mfg supported as Potential, Needs E/CS before Residue:03/24sb; ECS data recd 03/24/DRS; after mtg w/Valent and outcomes of e/cs data, Mfg no longer supports this project:05/24/sb
International Status:
Archive Location:
QA Archive:

               View International Status                View protocol            PST(Priority Setting Comments)  


View Performance/Crop Safety Data

Field Research DirectorExpediteTrial DelayField ID#RFCTO QAHQ RECD.Lab ID#Lab RECDLab CompProc. IDProc. ShippedProc. ReportRaw DataS Dir./Auditor
Ferguson, Connor P 20-TX-DMP RECD -NONE BATTS
Ferguson, Connor P 21-TX-DMP RECD -NONE BATTS
De La Fuente, Gerald P 23-OKP01 -NONE BATTS
Grichar, W. James P 23-TXP04 -NONE BATTS
Dotray, A. P 23-TXP05 -NONE BATTS
De La Fuente, Gerald P 23-TXP06 RECD -NONE BATTS
Performance Summary P 24-HQ-SUM RECD -NONE BATTS
  IR-4 Help Desk: Phone number: 919-515-1552 Email: ir-4_project@ncsu.edu
Contact Us   IR-4 Advisories/Training    Events    Links    Upload Files