Reduced Risk Status: |
|
IPM Compatibility: |
PER REQUESTER: GOOD FIT; THE USE OF GLUFOSINATE FOR PREPLANT BURNDOWN WEED CONTROL AND/OR TERMINATION OF FAILED PEANUT STANDS WILL PREVENT THE NEED FOR EXCESSIVE TILLAGE WHICH CAN RESULT IN UNDESIRABLE SOIL/PESTICIDE RUNOFF: 07/22
|
Reasons for need: |
1) PREPLANT BURNDOWN CONTROL OF VOLUNTEER PEANUT, HORSEWEED, ANNUAL MORNINGGLORY, PIGWEED. 2) TERMINATION OF FAILED PEANUT STANDS FOR REPLANTING; CURRENT PREPLANT STANDARD OF GLYPHOSATE + 2,4-D REQUIRES A MINIMUM PLANT-BACK OF 7 DAYS FOR PEANUT. ADDITIONALLY, GLYPHOSATE + 2,4-D IS NOT VERY EFFECTIVE ON VOLUNTEER PEANUTS AND/OR FAILED PEANUT STANDS. IMMEDIATE RE-PLANTING AFTER FAILED PEANUT STAND TERMINATION IS REQUIRED TO MAINTAIN ECONOMIC YIELDS.
|
Requesting State(s): |
GA:Prostko, E* ;
|
PCR Use Pattern: |
LIBERTY 2.34SL; DOSAGE 32 FL OZ /A, PREPLANT BURNDOWN, 1 APPLICATION, THE PLANTING INTERVAL FOLLOWING AN APPLICATION OF LIBERTY IS 0 DAYS
|
EPA Default Residue Trials: |
2-8 3 6-2 8
|
IR-4 Residue Trial Plan: |
2-5 3 6-2 8; A PROCESSING TRIAL
|
Residue Protocol Use Pattern: |
USE THE LIBERTY 280 SL PRODUCT (2.34 LB AI/GAL OF THE GLUFOSINATE-AMMONIUM ACTIVE INGREDIENT); MAKE ONE BROADCAST APPLIC OF 1.17 LB AI/A, IN 15-40 GPA, PRIOR TO PLANTING PEANUTS, WHICH SHALL BE PLANTED WITHIN THE SAME DAY THE APPLIC IS MADE, AFTER THE SPRAY HAS DRIED; EACH APPLIC SHALL INCLUDE AN AMMONIUM SULFATE AT 3 LB/A
|
Efficacy/Crop Safety (E/CS) Data Required: |
|
E/CS Research Comments: |
|
Label Use Pattern Submitted To EPA: |
|
EPA PIF Status: |
Green 02/23
|
EPA Status: |
|
EPA PRIA Date: |
|
MRID: |
|
Comments: |
LESS EFFECTIVE ON LARGER WEEDS; LESS EFFECTIVE THAN GLYPHOSATE; MUST BE APPLLIED FROM 1 HOUR AFTER SUNUP TO 2 HOURS BEFORE SUNSET
|
International Status: |
|
Archive Location: |
|
QA Archive: |
|