Reduced Risk Status: |
|
IPM Compatibility: |
PER REQUESTER, A VERY GOOD FIT; ALLOWS FOR A MORE DIVERSE HERBICIDE ROTATION OVER 2-YR PERIOD AND IS EFFECTIVE ON AMARANTHUS SPECIES; ALLOWS FARMERS TO ACHIEVE EFFECTIVE WEED CONTROL PRIOR TO PLANTING LIMA BEANS AND IMPROVE OVERALL WEED CONTROL
|
Reasons for need: |
CURRENTLY THE LABEL DOES NOT ALLOW FOR ROTATING TO LIMA BEANS THE FOLLOWING SEASON; BEING ABLE TO USE METRIBUZIN IN ROTATIONAL CROPS WILL ALLOW FOR A MORE DIVERSE HERBICIDE ROTATION OVER A 2-YR PERIOD; IT WILL ALLOW FARMERS TO ACHIEVE EFFECTIVE WEED CONTROL PRIOR TO PLANTING LIMA BEANS AND IMPROVE OVERALL CONTROL; NJ: The narrow range of herbicides available for lima bean systems makes it imperative to achieve thorough weed management in rotational crops, thereby reducing the soil weed seed bank and limiting future weed establishment pressure:09/25;
|
Requesting State(s): |
DE:VanGessel M* ; MD:Vollmer, K ; NJ:Besancon, T ; NY:Sosnoskie, L ;
|
PCR Use Pattern: |
METRICOR 75DF, VARIOUS, AT 3-12 OZ WT FOR SOYBEAN WITH 1 APPLIC; APPLYING WITH THE EXISTING LABEL REQUIREMENTS FOR SOYBEAN; MAY NOT BE COMPATIBLE WITH LATE PLANTED SOYBEAN
|
EPA Default Residue Trials: |
LIMA:2-4 5 10-2 11; DRIED:1 5-5 7-2 8 9 10 11
|
IR-4 Residue Trial Plan: |
|
Residue Protocol Use Pattern: |
|
Efficacy/Crop Safety (E/CS) Data Required: |
|
E/CS Research Comments: |
|
Label Use Pattern Submitted To EPA: |
|
EPA PIF Status: |
EPA YELLOW: 08/22, 08/23
|
EPA Status: |
|
EPA PRIA Date: |
|
MRID: |
|
Comments: |
EPA CAUTION: 08/21, 08/23; 2022 workshop docs indicate support was Potential: E/CS before approval for Residue:08/25/sb; E/CS data being collected in multi-crop trials under metribuzin/spinach priority, See PR 13362 E/CS protocol, JPB, 08/23; Status changed from "ECS data ongoing" to "Covered By Another Project". Data is covered under P13362 Metribuzin/Snap Bean 05/24/drs; ADAMA is currently reviewing E/CS data so the status was changed from Cov by Another Project to Under Eval to allow the project to go on nominations while they review:08/25/sb; during the 2025 FUW, Adama advised they will support as Researchable, Only Residue Data Needed:09/25;
|
International Status: |
|
Archive Location: |
|
QA Archive: |
|