Simple Search
||
Full Search
||
Master Schedule
||
Key Words Search
||
Time Line
||
International Projects
||
Tentative Schedule / Draft Protocols
||
Study Protocols
||
Integrated Solutions Search
||
Test Substance Disposal
||
Help
Session Idle:
seconds.
Session Expiring!
Your Session will expire in
seconds.
Do you want to reset?
General Search of Food Request Database. IR-4 Food Use Request.
This page includes all the trials related to the PR#.
Submit Supporting/Similar Request
PR#
Priority
Pesticide(MFG)
Commodity (Crop Group)
Project Status
13332
B
2,4-D CHOLINE
(
CORTEVA
)
CANEBERRY (BLACKBERRY)
(
13-07A
=
CANEBERRY SUBGROUP
)
UNDER EVALUATION
Reduced Risk Status:
IPM Compatibility:
PER REQUESTOR, GOODFIT; PROVIDES CONTROL OF WEEDS THAT ARE DIFFICULT TO CONTROL
Reasons for need:
WEEDS, LIMITED HERBICIDES AVAILABLE TO CONTROL PROBLEMATIC BROADLEAF WEEDS
Requesting State(s):
AR:Wright-Smith, H ; IN:Meyers, S ; NC:Jennings, K* ; NJ:Besancon, T ; OH:Robinson, A ;
PCR Use Pattern:
EMBED EXTRA, 1-2 PINTS/A; DIRECTED TO BUSHES, WITH 1 OR 2 APPLIC, RETREATMENT INTERVAL OF AT LEAST 30 DAYS, AND A 30-DAY PHI; APPLY IN DORMANT STAGE AND AGAIN IN EARLY SPRING, LIMIT CONTACT WITH FOLIAGE
EPA Default Residue Trials:
1/2 6 10 12-3
IR-4 Residue Trial Plan:
Residue Protocol Use Pattern:
Efficacy/Crop Safety (E/CS) Data Required:
E/CS Research Comments:
IN THE PERFORMANCE PROTOCOL FOR 2022: EVALUATING EFFICACY AND CROP SAFETY OF 2,4-D CHOLINE FOR WEED CONTROL IN CANEBERRY; TRIALS WILL BE CONDUCTED FOR 2 YEARS, WITH THE SAME TREATMENTS APPLIED TO THE SAME PLOTS EACH YEAR; TESTING 2 RATES OF EMBED EXTRA (3.8 LB AE/GAL) (RATES OF 1.43 AND 2.85 LB AE/A PLUS A LABELED RATE OF AN ADJUVANT) COMPARED WITH A WEED-FREE UNTREATED; MAKE A TOTAL OF 3 APPLIC EACH YEAR, IN AT LEAST 10 GPA; MAKE 1ST APPLIC ABOUT 14 DAYS PRIOR TO EXPECTED PRIMOCANE EMERGENCE, 2ND APPLIC ABOUT 30 DAYS LATER AND 3RD APPLIC AFTER LAST HARVEST; EACH APPLIC IS MADE AS A BANDED SPRAY - SEE PROTOCOL FOR MORE APPLIC DETAILS AND REQUIREMENTS; EVALUATE CROP INJURY, WEED CONTROL AND CROP YIELD; THE 2023 PERFORMANCE PROTOCOL PROVIDES CONTINUATION OF THE 2022 TRIALS ON THE SAME PLOTS
Label Use Pattern Submitted To EPA:
EPA PIF Status:
EPA GREEN: 08/23
EPA Status:
EPA PRIA Date:
MRID:
Comments:
CATEGORY CHANGED FROM POTENTIAL, E/CS DATA BEFORE APPROVAL FOR RESIDUE STUDY TO E/CS DATA ONGOING:12/21; STATUS UPDATED TO RESEARCHABLE, E/CS ON-GOING; RESIDUE DATA NEEDED:10/22; EPA GREEN: 08/23; E/CS Data on-going updated to Under Eval to determine if we can move forward with Residue:08/24/sb; E/CS is complete and will wait to hear back from Corteva to see if the status can be updated to pursue residue:09/24/sb;
International Status:
Archive Location:
QA Archive:
View International Status
View protocol
PST(Priority Setting Comments)
View Performance/Crop Safety Data
Field Research Director
Expedite
Trial Delay
Field ID#
RFC
TO QA
HQ RECD.
Lab ID#
Lab RECD
Lab Comp
Proc. ID
Proc. Shipped
Proc. Report
Raw Data
S Dir./Auditor
Bertucci, Matt
P 22-ARP02
RECD
-NONE
BATTS
Bolda, Mr. Mark
P 22-CAP05
RECD
-NONE
BATTS
Mitchem, Wayne
P 22-NCP03
RECD
-NONE
BATTS
Moretti, Marcelo
P 22-ORP09
RECD
-NONE
BATTS
Bertucci, Matt
P 23-ARP02
RECD
-NONE
BATTS
Bolda, Mr. Mark
P 23-CAP30
RECD
-NONE
BATTS
Mitchem, Wayne
P 23-NCP06
RECD
-NONE
BATTS
Moretti, Marcelo
P 23-ORP11
RECD
-NONE
BATTS
Performance Summary
P 24-HQ-SUM
RECD
-NONE
BATTS
IR-4 Help Desk: Phone number: 919-515-1552 Email:
ir-4_project@ncsu.edu
Contact Us
IR-4 Advisories/Training
Events
Links
Upload Files