Session Idle:  seconds.

General Search of Food Request Database. IR-4 Food Use Request.
This page includes all the trials related to the PR#.
      

Submit Supporting/Similar Request
PR#PriorityPesticide(MFG)Commodity (Crop Group)Project Status
13296 GLUFOSINATE ( BASF,UPL NA ) MANGO ( 24B = TROPICAL AND SUBTROPICAL, MEDIUM TO LARGE FRUIT, SMOOTH, INEDIBLE PEEL SUBGROUP ) RESEARCHABLE, E/CS ON-GOING; RESIDUE DATA NEEDED

Reduced Risk Status:
IPM Compatibility: PER REQUESTOR, GOODFIT; USE COMPATIBLE WITH CURRENT CULTURAL PRACTICES
Reasons for need: PARTHENIUM AND OTHER HARD TO CONTROL WEEDS, NOTHING CURRENTLY REGISTERED FOR MANGO CONTROLS PARTHENIUM
Requesting State(s): FL:Crane, J* ;
PCR Use Pattern: RELY 280; 1.5 LB AI/ACRE (82 OZ/ACRE); TRACTOR MOUNTED HERBICIDE RIG OR BACKPACK APPLICATION, 3 APPLICATIONS WITH A 30 DAY RE-TREATMENT INTERVAL, AND 0 DAY PHI. RELY IS A CONTACT HERBICIDE, DO NOT APPLY IF RAIN IS EXPECTED WITHIN 4 HR OF APPLICATION. APPLY ONLY TO WEEDS, DO NOT CONTACT CROP PLANTS; DO NOT SPRAY WATER BODIES, DURING WINDY WEATHER CONDITIONS; REI = 12 HRS
EPA Default Residue Trials:
IR-4 Residue Trial Plan:
Residue Protocol Use Pattern:
Efficacy/Crop Safety (E/CS) Data Required:
E/CS Research Comments: IN THE PERFORMANCE PROTOCOL FOR 2022 TRIALS: EVALUATING PERFORMANCE OF GLUFOSINATE FOR WEED CONTROL IN NEWLY ESTABLISHED MANGO (AT LEAST 3-MONTH OLD PLANTS); TESTING 2 RATES OF RELY 280 (2.34 LB AI/GAL) (RATES OF 3.08 AND 4.5 LB AI/A + 3 LB/A OF AMMONIUM SULFATE [AMS]) COMPARED WITH A WEED-FREE UNTREATED; MAKE 3 BANDED APPLIC OF EACH TREATMENT, IN >20 GPA, 3-MONTH INTERVALS; APPLY BANDED ON EACH SIDE OF THE CROP ROW AND BETWEEN PLANTS, OUT TO A MINIMUM 3 FT ON EACH SIDE OF THE CROP ROW; EVALUATE PLANT HEIGHT AND TRUNK CIRCUMFERENCE AT THE SOIL LINE, AND CROP INJURY; YIELD AND WEED CONTROL DATA ARE NOT REQUIRED; in Nov 2022, BASF advised to waive the 2 ECS fts planned for 2023 since they had enough safety data with their internal GH trials:01/24/sb
Label Use Pattern Submitted To EPA:
EPA PIF Status: Orange 08/23
EPA Status:
EPA PRIA Date:
MRID:
Comments: CATEGORY CHANGED FROM NEED E/CS DATA BEFORE APPROVAL FOR RESIDUE STUDY TO E/CS DATA ONGOING:12/21; STATUS UPDATED TO RESEARCHABLE, E/CS ON-GOING; RESIDUE DATA NEEDED:10/22; EPA HOLD CAUTION:08/23
International Status:
Archive Location:
QA Archive:

               View International Status                View protocol            PST(Priority Setting Comments)  


View Performance/Crop Safety Data

Field Research DirectorExpediteTrial DelayField ID#RFCTO QAHQ RECD.Lab ID#Lab RECDLab CompProc. IDProc. ShippedProc. ReportRaw DataS Dir./Auditor
Robles Vazquez, W. P 22-PRP03 RECD -NONE BATTS
Robles Vazquez, W. P 22-PRP04 RECD -NONE BATTS
Performance Summary P 24-HQ-SUM -NONE BATTS
  IR-4 Help Desk: Phone number: 919-515-1552 Email: ir-4_project@ncsu.edu
Contact Us   IR-4 Advisories/Training    Events    Links    Upload Files