Reduced Risk Status: |
|
IPM Compatibility: |
PER REQUESTOR: GOOD FIT; IT HAS POTENTIAL TO BE ALTERNATE WITH ETHOPROP AND OXAMIL. KEEPS SOIL HEALTH WHILE PRESERVING COMPATIBILITY FOR BENEFICIAL AND NON-TARGET ORGANISMS. COMPATIBLE TO CULTURAL PRACTICES SUCH AS CROP ROTATION, CROP DESTRUCTION RESIDUES, CORM TREATMENT AND CLEANING.
|
Reasons for need: |
PLANT PARASITIC NEMATODES RADOPHOLUS SIMILIS, PRATYLENCHUS COFFEAE, HELICOTYLENCHUS MULTICINCTUS, MELOIDOGYNE INCOGNITA, ROTYLENCHULUS RENIFORMIS; LACK OF AVAILABLE PRODUCTS FOR NEMATODE MANAGEMENT
|
Requesting State(s): |
HI:Coughlin, J ; PR:Robles, W* ;
|
PCR Use Pattern: |
SALIBRO, 1 LB. AI/A, 2 APPLICATIONS, MAKE FIRST APPLICATION TO SOIL INCORPORATED PRIOR TRANSPLANT. SECOND APPLICATION SOIL DIRECTED POST PLANTING; PHI OF 72 DAYS;
|
EPA Default Residue Trials: |
3 13-4
|
IR-4 Residue Trial Plan: |
|
Residue Protocol Use Pattern: |
|
Efficacy/Crop Safety (E/CS) Data Required: |
Corteva is looking for another year of efficacy data in 2024:08/23
|
E/CS Research Comments: |
IN THE 2022 PERFORMANCE PROTOCOL: TESTING 3 RATES OF THE SALIBRO PRODUCT (15.4, 30.7, 61.4 FL OZ/A), ALSO KNOWN AS REKLEMEL™ SC, FOR NEMATODE CONTROL ON BANANA VARIETIES SUSCEPTIBLE TO NEMATODES, COMPARED WITH A VYDATE STANDARD; APPLY REKLEMEL TO THE SOIL AROUND REPLANTED DAUGHTER STEMS AT PLANTING AND AGAIN 4-8 WEEKS AFTER PLANTING OR IN SYNCHRONY WITH ROOT GROWTH AND THE PRECIPITATION SEASON; EVALUATE EFFICACY AND CROP INJURY; YIELD DATA ARE OPTIONAL; IN THE 2024 PERFORMANCE PROTOCOL: TESTING 2 RATES OF SALIBRO (30.7, 61.4 FL OZ/A), APPLIED AS IN THE 2022 PROTOCOL, BUT WITH THE 2ND APPLIC 4-6 WKS AFTER THE 1ST; EVALUATE EFFICACY AND CROP INJURY, AND YIELD DATA ARE OPTIONAL
|
Label Use Pattern Submitted To EPA: |
|
EPA PIF Status: |
; Blue: 08/23
|
EPA Status: |
|
EPA PRIA Date: |
|
MRID: |
|
Comments: |
Mfg supports as "Potential: E/CS Data Before Approval for Residue Study". STATUS UPDATED TO RESEARCHABLE, E/CS ON-GOING; RESIDUE DATA NEEDED:10/22; Status updated to "E/CS Data on-going" based on 2022 E/CS signed protocol:10/23/sb; Status changed from "ECS ongoing" to "Under Eval" for visibility during nominations 08/24/ds
|
International Status: |
|
Archive Location: |
|
QA Archive: |
|