|
FOOD CROPS SUPPORTING/SIMILAR REQUEST
|
PR# | Pesticide(MFG) | Commodity (Crop Group) | Project Status | Req States |
13832
A
|
LINURON
(
TKI
)
|
SWEET POTATO
(
01CD = TUBEROUS AND CORM VEGETABLES SUBGROUPS
)
|
RESEARCHABLE, ONLY RESIDUE DATA NEEDED (03)
|
AR; HQ; LA; MS; NC; NJ; OK; PR; WI;
|
|
Reasons for need: |
Copied from 11118: ANNUAL GRASS AND BROADLEAF WEEDS; PER NC ME-TOO REQUEST, ONLY ONE HERBICIDE REGISTERED; NEED MORE EFFICACIOUS OPTIONS:08/19:07/24/sb; NC-represents over 60% of total production & growers need tools to ensure their ability to continue to produce & Alternative mode of action for control of resistant Palmer amaranth and it will also control Palmer amaranth postemergence. Currently no postemergence herbicides available for over the top application in sweetpotato:07/24/sb;
|
Residue Data Sites: |
2-4 3 4 6 10; 1 DECLINE TRIAL
|
Performance Data Required: |
|
Use Pattern: |
Copied from 11118: 1-1.5 PT/A (LINEX); 1 OR 2 APPLIC TO SOIL PRE OR OVER-THE-TOP POST TRANSPLANT (0-14 DAYS AFTER PLANTING); 75-90 DAY PHI;; PER NC ME-TOO REQUEST, APPLY PREEMERGENCE AFTER SEEDING AND AFTER SOIL IS PLACED OVER POTATOES PRIOR TO APPLIC OF CLEAR PLASTIC MULCH:07/24/sb
|
Comments: |
This was an initial study under PR# 11118, but due to analytical concerns we have been unable to complete. We hope to address analytical issues, but do not know if we will be successful. Therefore, this new PR# was created and will have to be re-prioritized, if we are able to address the analytical issues and there is still a need:07/24/sb; SSR names copied over from 11118:07/24/sb; TKI supports as Researchable, Only Residue Data Needed:07/24/sb
|
State Requestor: |
AR:Burgos, N ; HQ:IR-4 Headquarters* ; LA:Miller, D ; MS:Shankle, M, Henn, A ; NC:Grainger, M, Smith, SC, Jennings, K ; NJ:Besancon, T ; OK:Luper, C ; PR:Robles, W ; WI:Heider, D ;
|
|
Are you sure the use pattern, above, is suitable to your needs? If yes, please enter your contact information below, click “Submit”,
and a Supporting/Similar PCR will be submitted.
If no, or you are not sure, click
here
and you will be redirected to the new “IR-4 Minor Use Project Clearance Request Form”.
|
|
|
|
|
|