Session Idle:  seconds.

General Search of Food Request Database. IR-4 Food Use Request.
This page includes all the trials related to the PR#.
      

Submit Supporting/Similar Request
PR#PriorityPesticide(MFG)Commodity (Crop Group)Project Status
13718 A INDOXACARB ( FMC ) CLOVER (SEED CROP) ( 18 = NONGRASS ANIMAL FEEDS GROUP ) RESIDUE ON-GOING; E/CS DATA ON-GOING

Reduced Risk Status: THIS AI HAS BEEN CLASSIFIED AS RR FOR ONE OR MORE FOOD USES.
IPM Compatibility: Per Requester: Good Fit; New MOA for control of clover seed weevil. When applied before bloom, more pollinator-safe than current grower standard materials (bifenthrin, malathion):08/23
Reasons for need: clover seed weevil; Insecticide resistance and field-level control failures are common in white clover seed, which has been controlled with bifenthrin. The other alternative, malathion, has substantive bee safety concerns and resistance development concerns:08/23
Requesting State(s): OR:Lightle, D* ;
PCR Use Pattern: Apply Steward as a broadcast foliar spray at 11.3 fl oz product/ac, 1 application in pre-bloom, 30 day PHI
EPA Default Residue Trials: 11/12-5
IR-4 Residue Trial Plan: 11/12-5 (1 decline)
Residue Protocol Use Pattern: USE THE STEWARD EC INSECTICIDE PRODUCT (1.25 LB AI/GAL OF INDOXACARB ACTIVE INGREDIENT); MAKE 1 FOLIAR BROADCAST APPLIC OF 0.11 LB AI/A IN 20-50 GPA, 30 DAYS BEFORE HARVEST; ALL APPLIC SHALL INCLUDE AN ADJUVANT AT A LABELED RATE
Efficacy/Crop Safety (E/CS) Data Required:
E/CS Research Comments: PER THE 2024 PERFORMANCE PROTOCOL: TESTING STEWARD EC VS MALATHION FOR CONTROL OF CLOVER SEED WEEVIL IN WHITE CLOVER (SEED CROP); MAKE ONE BROADCAST APPLIC OF 11.3 FL OZ PRODUCT/A, IN AT LEAST 15 GPA, IN PRE-BLOOM AT FIRST LARVAL DETECTION (APPLY AT NIGHT TO AVOID CONTACT WITH ACTIVE POLLINATORS); EVALUATE EFFICACY, CROP YIELD AND PHYTOTOXICITY
Label Use Pattern Submitted To EPA:
EPA PIF Status: Green 12/23
EPA Status:
EPA PRIA Date:
MRID:
Comments: Mfg supported at the 2023 FUW as Researchable, Residue & E/CS Data Needed:09/23/sb; EPA Green 12/23; Changed from "Researchable, Residue & E/CS Data Needed" to "ECS ongoing" until residue protocol is signed 03/24/DRS; Status changed to Res ongoing ECS ongoing 03/24/DRS;
International Status:
Archive Location:
QA Archive:

               View International Status                View protocol            PST(Priority Setting Comments)  

Field Research DirectorExpediteTrial DelayField ID#RFCTO QAHQ RECD.Lab ID#Lab RECDLab CompProc. IDProc. ShippedProc. ReportRaw DataS Dir./Auditor
Meeks, Mr. Will 24-ID145 24-CAR17 PIKE WSR
Lightle, Dani 24-OR274 24-CAR17 PIKE WSR
Lightle, Dani 24-OR275 24-CAR17 PIKE WSR
Larson, Duane 24-WA*326 24-CAR17 PIKE WSR
Larson, Duane 24-WA*327 24-CAR17 PIKE WSR

View Performance/Crop Safety Data

Field Research DirectorExpediteTrial DelayField ID#RFCTO QAHQ RECD.Lab ID#Lab RECDLab CompProc. IDProc. ShippedProc. ReportRaw DataS Dir./Auditor
Kaur, Navneet P 24-ORP07 -NONE AXTELL
Kaur, Navneet P 24-ORP15 -NONE AXTELL
  IR-4 Help Desk: Phone number: 919-515-1552 Email: ir-4_project@ncsu.edu
Contact Us   IR-4 Advisories/Training    Events    Links    Upload Files