Reduced Risk Status: |
|
IPM Compatibility: |
PER REQUESTER, A VERY GOOD FIT; INSECTICIDES FOR USE IN GREENHOUSE, ESPECIALLY WITH A NEW IRAC GROUP, ARE KEY TO MANAGING INSECT PESTS; TSSM MANAGEMENT IS A MAJOR CHALLENGE; THIS INSECTICIDE ALSO HAS PEPPER WEEVIL ACTIVITY
|
Reasons for need: |
NOTHING REGISTERED FOR PEPPER WEEVIL, THE CAUSE FOR MOST GREENHOUSES STOPPING TO GROW THIS CROP; WESTERN FLOWER THRIPS A SIGNFICANT PROBLEM FOR NORTHEAST
|
Requesting State(s): |
CA:Sfetcu, D ; FL:Bledsoe, M* ; MI:Tift, K ; NY:Gilrein, D ;
|
PCR Use Pattern: |
ISOCYCLOSERAM AT A RATE OF 296 G AI/HA AS A FOLIAR APPLIC, WITH 2-3 APPLIC; RE-TREATMENT INTERVAL 7-14 DAYS, 0-4 DAY PHI; FOLIAR APPLIC AT LABELED RATE; NO KNOWN LIMITATIONS:01/22; RATE ENTERED APPEARS TO BE INCORRECT; FOLLOW DFU'S LISTED BELOW UNDER E/CS DATA REQUIREMENTS:03/22
|
EPA Default Residue Trials: |
ANY 4 TRIALS
|
IR-4 Residue Trial Plan: |
ANY 4 TRIALS (LARGE & SMALL PEPPERS)
|
Residue Protocol Use Pattern: |
USE THE SC200 FORMULATION OF ISOCYCLOSERAM (1.7 LB AI/GAL); MAKE 3 FOLIAR APPLIC OF 0.08 LB AI/A IN 70-100 GPA, 7-DAY INTERVAL, 1-DAY PHI; ALL APPLIC SHALL INCLUDE A LABELED RATE OF A NON-IONIC SURFACTANT OR HORTICULTURAL OIL
|
Efficacy/Crop Safety (E/CS) Data Required: |
DFUS - 90 G AI/HA, 3 FOLIAR APPLIC, 7-DAY RTI, 1-DAY PHI:03/22
|
E/CS Research Comments: |
IN THE 2023 PERFORMANCE PROTOCOL: EVALUATING EFFICACY ON PEPPER WEEVIL (INOCULATED) AND THRIPS (NATURAL POPULATION) IN A GREENHOUSE TRIAL; MAKE 4-5 FOLIAR APPLIC (7-DAY INTERVAL) OF A 5.2 FL OZ/A RATE OF PLINAZOLIN SC200, COMPARED WITH ACTARA+VYDATE AS A STANDARD (INCLUDE A NON-IONIC ADJUVANT WITH EACH APPLIC); SEE PROTOCOL FOR MORE APPLIC/USE PATTERN DETAILS; EVALUATE WEEVIL AND THRIPS CONTROL, YIELD (DAMAGED FRUIT, ETC.) AND CROP INJURY; Syngenta advised e/cs data is satisfactory:06/24/sb
|
Label Use Pattern Submitted To EPA: |
|
EPA PIF Status: |
Blue 08/22
|
EPA Status: |
|
EPA PRIA Date: |
|
MRID: |
|
Comments: |
WESTERN FLOWER THRIPS A SIGNFICANT PROBLEM FOR NORTHEAST; Syngenta advised e/cs data is satisfactory so status updated from Residue on-going; e/cs data on-going to Complete With Ongoing Trials;06/24/sb
|
International Status: |
|
Archive Location: |
|
QA Archive: |
|