Session Idle:  seconds.

General Search of Food Request Database. IR-4 Food Use Request.
This page includes all the trials related to the PR#.
      

Submit Supporting/Similar Request
PR#PriorityPesticide(MFG)Commodity (Crop Group)Project Status
12867 A S-METOLACHLOR/METOLACHLOR ( SYNGEN,UPL NA ) GOLD-OF-PLEASURE (CAMELINA) ( 20A = RAPESEED SUBGROUP ) STUDY CANCELED BY IR-4

Reduced Risk Status:
IPM Compatibility: PER REQUESTER: VERY GOOD IPM FIT:08/19
Reasons for need: GRASS AND SOME BROADLEAF WEEDS (WILL NOT CONTROL EMERGED WEEDS); THIS IS ONE OF THE ONLY OPTIONS FOR FAIR-GOOD CONTROL OF PIGWEED AND WATERHEMP, TWO OF THE MOST PROBLEMATIC WEEDS OF THE REGION
Requesting State(s): MT:Miller, Z ; NV:Walia, M ; OR:DeFrancesco, J ; SD:Reicks, G ;
PCR Use Pattern: MAKE ONE BROADCAST APPLIC OF 2 PT/A TO THE SOIL; APPLY IN SPRING, BUT NO LATER THAN EARLY BOLTING; RAIN IS REQUIRED TO INCORPORATE THE PRODUCT
EPA Default Residue Trials:
IR-4 Residue Trial Plan: ANY 4 TRIALS WHERE THE CROP IS GROWN
Residue Protocol Use Pattern: USE THE DUAL MAGNUM PRODUCT (7.62 LB AI/GAL); MAKE 1 POST PLANT, PREEMERGENCE (AFTER SEEDING BUT BEFORE THE CROP AND WEEDS EMERGE) BROADCAST APPLIC OF 1.9 LB AI/A, IN 10-40 GPA, WITHIN 48 HR OF PLANTING; TO ACTIVATE HERBICIDE, AT LEAST 0.5-0.75 INCH OF WATER (RAIN AND/OR IRRIGATION) IS NEEDED WITHIN 7 DAYS AFTER APPLIC
Efficacy/Crop Safety (E/CS) Data Required: NEED A TRIAL IN MT IN 2021:10/20
E/CS Research Comments: PER 2020 PERFORMANCE PROTOCOL: TESTING 3 RATES OF DUAL MAGNUM (0.95, 1.90, 3.81 LB AI/A); MAKE 1 PRE-EMERGENCE BROADCAST APPLIC OF EACH TREATMENT, IN 10-40 GPA, AFTER SEEDING AND BEFORE CROP OR WEEDS EMERGE; TO ACTIVATE HERBICIDE, AT LEAST 0.5 INCH OF WATER (RAIN AND/OR IRRIGATION) IS NEEDED WITHIN 7 DAYS AFTER APPLIC; EVALUATE CROP INJURY, WEED CONTROL AND CROP DEVELOPMENT AND YIELD; IN THE SD TRIAL, FOLLOW THE SAME PROTOCOL AND MAKE THE SAME EVALUATIONS, EXCEPT INCLUDE A SECOND APPLIC OF EACH TREATMENT, POSTEMERGENCE TO THE ESTABLISHED CROP JUST BEFORE FLOWER STALK ELONGATION (BOLTING); THE 2021 PERFORMANCE PROTOCOL FOR A MT TRIAL INCLUDES THE SAME USE PATTERN (JUST 1 APPLIC) AND EVALUATION REQUIREMENTS DETAILED IN THE 2020 PROTOCOL; THE 2023 PERFORMANCE PROTOCOL FOR A MT TRIAL FOLLOWS THE SAME REQUIREMENTS AS THE 2021 PROTOCOL
Label Use Pattern Submitted To EPA:
EPA PIF Status: GREEN:12/19
EPA Status:
EPA PRIA Date:
MRID:
Comments: DATA MINING REPORTS FROM XH504 COPIED TO THIS PR#; NO KEY EXPORT MARKET NOTED; CROP REQUESTED WAS WINTER CAMELINA:08/19; MFG MADE RESEARCHABLE:09/17/19; EPA GREEN:12/19; THIS STUDY IS IN THE PROCESS OF BEING CANCELLED AND AN 4 ADDITIONAL FT'S WILL BE CONDUCTED UNDER NEWLY CREATED PR# 13177:10/20
International Status:
Archive Location: 58-5
QA Archive:

               View International Status                View protocol            PST(Priority Setting Comments)  

Field Research DirectorExpediteTrial DelayField ID#RFCTO QAHQ RECD.Lab ID#Lab RECDLab CompProc. IDProc. ShippedProc. ReportRaw DataS Dir./Auditor
Meeks, Mr. Will 20-ID190 10/09/20 20-YAR06 XC-MOORE,P HQ
Meeks, Mr. Will 20-ID191 10/09/20 20-YAR06 XC-MOORE,P HQ
Reicks, Graig 20-SD378 11/03/21 20-YAR06 XC-MOORE,P HQ
Reicks, Graig 20-SD379 11/03/21 20-YAR06 XC-MOORE,P HQ

View Performance/Crop Safety Data

Field Research DirectorExpediteTrial DelayField ID#RFCTO QAHQ RECD.Lab ID#Lab RECDLab CompProc. IDProc. ShippedProc. ReportRaw DataS Dir./Auditor
Jha, P. P 11-MT-DMP RECD -NONE BATTS
Hanson, Brad P 14-CA-DMP RECD -NONE BATTS
Betts, Kevin P 19-MN-DMP RECD -NONE BATTS
Miller, Dr Zach P 20-MTP01 RECD -NONE BATTS
Felix, J. P 20-ORP02 RECD -NONE BATTS
Reicks, Graig P 20-SDP05 NA -NONE BATTS
Betts, Kevin P 21-MN-DMP RECD -NONE BATTS
Miller, Dr Zach P 21-MTP01 NA -NONE BATTS
Miller, Dr Zach P 23-MTP01 RECD -NONE BATTS
Performance Summary P 24-HQ-SUM RECD -NONE BATTS
  IR-4 Help Desk: Phone number: 919-515-1552 Email: ir-4_project@ncsu.edu
Contact Us   IR-4 Advisories/Training    Events    Links    Upload Files