Session Idle:  seconds.

General Search of Food Request Database. IR-4 Food Use Request.
This page includes all the trials related to the PR#.
      

Submit Supporting/Similar Request
PR#PriorityPesticide(MFG)Commodity (Crop Group)Project Status
13000 A CHLORANTRANILIPROLE ( FMC ) HEMP ( 99 = MISC GROUP ) E/CS DATA ON-GOING

Reduced Risk Status: THIS AI HAS BEEN CLASSIFIED AS RR FOR ONE OR MORE FOOD USES.
IPM Compatibility: PER REQUESTER: VERY GOOD IPM FIT; THIS MATERIAL IS REGISTERED IN BOTH GREENHOUSE AND FIELD USE ON MANY CROPS; HEMP GROWERS ARE ALREADY FAMILIAR WITH THIS PESTICIDE AND IT IS EFFECTIVE ON KEY TARGET PESTS:05/20
Reasons for need: LEPIDOPTERA, WHITEFLY; NOTHING REGISTERED
Requesting State(s): AL:Ajayi, O ; DE:Owens, D ; FL:Bledsoe, M* ; KY:Bessin, R ; VA:McCoy, T ;
PCR Use Pattern: USE THE CORAGEN PRODUCT; MAKE UP TO 4 APPLIC PER CROP (FOLIAR, CHEMIGATION, DRENCH) OF 0.045-0.098 LB AI/A, 3-10 DAY INTERVAL, 7-DAY PHI
EPA Default Residue Trials:
IR-4 Residue Trial Plan: 5 fiber, 3 cbd & 2 gh (cbd) (processing on fiber & cbd) (decline on fiber)
Residue Protocol Use Pattern:
Efficacy/Crop Safety (E/CS) Data Required:
E/CS Research Comments: PER 2024 PERFORMANCE PROTOCOL: TESTING 2 RATES OF CHLORANTRANILIPROLE (CORAGEN eVO PRODUCT) FOR CORN EARWORM CONTROL IN GH HEMP IN AL (ARTIFICIAL INOCULATION) AND IN FIELD HEMP IN OR (APPPLY WHEN LARVAE ARE OBSERVED IN 2 OR 3 REPS); IN THE FIELD TRIAL, APPLY 1.7 FL OZ/A AS A FOLIAR SPRAY STARTING AT EARLY BLOOM FOR 3 TIMES AT A 7-DAY INTERVAL; IN THE GH TRIAL APPLY 2.5 FL OZ/A ONCE AS A DRENCH AT EARLY BLOOM 7 DAYS BEFORE INFESTATION; EVALUATE EFFICACY ON WORMS, DAMAGE RATING AND PHYTOTOXICITY; SEE PROTOCOL FOR MORE DETAILED STUDY CONDUCT REQUIREMENTS
Label Use Pattern Submitted To EPA:
EPA PIF Status: GREEN: 08/20, 08/22; YELLOW 08/23
EPA Status:
EPA PRIA Date:
MRID:
Comments: REQUEST IS FOR FIELD AND GH USE; NO KEY EXPORT MARKET NOTED:05/20; EPA GREEN:08/20, 08/22; YELLOW 08/23; E/CS trial includes PR#13011 03/24/DRS; Status changed to "ECS ongoing", and will change to "Res ongoing ECS ongoing" when res protocol is signed 03/24/DRS;
International Status:
Archive Location:
QA Archive:

               View International Status                View protocol            PST(Priority Setting Comments)  

Field Research DirectorExpediteTrial DelayField ID#RFCTO QAHQ RECD.Lab ID#Lab RECDLab CompProc. IDProc. ShippedProc. ReportRaw DataS Dir./Auditor
MOORE,P

View Performance/Crop Safety Data

Field Research DirectorExpediteTrial DelayField ID#RFCTO QAHQ RECD.Lab ID#Lab RECDLab CompProc. IDProc. ShippedProc. ReportRaw DataS Dir./Auditor
Ajayi, Olufemi P 24-ALP04 -NONE AXTELL
Shrestha, Govinda P 24-ORP16 -NONE AXTELL
  IR-4 Help Desk: Phone number: 919-515-1552 Email: ir-4_project@ncsu.edu
Contact Us   IR-4 Advisories/Training    Events    Links    Upload Files