Session Idle:  seconds.

General Search of Food Request Database. IR-4 Food Use Request.
This page includes all the trials related to the PR#.
      

Submit Supporting/Similar Request
PR#PriorityPesticide(MFG)Commodity (Crop Group)Project Status
12562 A PYRIDABEN ( GOWAN ) MIRACLE FRUIT ( 26 = SPICES CROP GROUP ) RESIDUE ON-GOING; E/CS DATA ON-GOING

Reduced Risk Status:
IPM Compatibility: PER REQUESTOR: UNKNOWN IPM FIT; THIS CROP IS CURRENTLY GROWN UNDER A POLE AND CABLE SHADE SCREENHOUSE IN CONTAINERS AND IS BEING TESTED FOR OUTDOOR PRODUCTION:08/18
Reasons for need: MITES THAT ATTACK LEAVES AND FRUIT; NOTHING REGISTERED FOR THIS CROP TO CONTROL MITES
Requesting State(s): FL:Crane, J ;
PCR Use Pattern: USE THE SANMITE SC PRODUCT; MAKE 5 FOLIAR APPLIC OF 6.4-9.6 OZ/A, 30-DAY INTERVAL, 14-DAY PHI; LIMIT TO 2 APPLIC/YR; APPLY WHEN MITES ARE DETECTED; ROTATE WITH OTHER MITICIDES TO AVOID RESISTANCE
EPA Default Residue Trials:
IR-4 Residue Trial Plan: ANY 4 TRIALS; 2 Red A trials needed for 24 field season
Residue Protocol Use Pattern: USE THE NEXTER SC PRODUCT (3.75 LB AI/GAL OF THE ACTIVE INGREDIENT PYRIDABEN); MAKE 2 FOLIAR DIRECTED APPLIC OF 0.498 LB AI/A IN 20-100 GPA AT A 30-DAY INTERVAL, 7-DAY PHI; ALL APPLIC SHALL INCLUDE AN ADJUVANT AT A LABELED RATE
Efficacy/Crop Safety (E/CS) Data Required:
E/CS Research Comments: PER THE 2024 PERFORMANCE PROTOCOL: COMPARING EFFICACY AND CROP SAFETY OF PYRIDABEN (NEXTER SC) FOR CONTROL OF SPIDER MITES ON MIRACLE FRUIT (VS ANOTHER MITICIDE [NONE ARE REGISTERED]); APPLY 502 ML/A OF NEXTER AS A FOLIAR SPRAY, TWICE, AT A 30-DAY INTERVAL, 7-DAY PHI; EVALUATE MITE CONTROL EFFICACY AND CROP INJURY
Label Use Pattern Submitted To EPA:
EPA PIF Status: GREEN:09/19, 08/20, 08/21, 08/22
EPA Status:
EPA PRIA Date:
MRID:
Comments: NO EXPORT MARKETS NOTED; THIS CROP IS PROPOSED TO BE IN THE SPICE CROP GROUP 26; THERE IS NO TOLERANCE FOR DILL OR SPICE SUBGROUP 19B:08/18; EPA GREEN:09/19; IR-4 SOUTHERN REGION TO CONFIRM PEST COMPLEX TARGET(S), THEN MAY NOT NEED E/CS DATA:05/20; EPA GREEN: 08/20, 08/21, 08/22; Residue Protocol signed awaiting ECS Protocol: 05/23, JPB; E/CS protocol signed 01/24 02/24/DRS; Complete with on-going trials updated to Residue On-going; E/CS data on-going:01/24/sb;
International Status:
Archive Location:
QA Archive:

               View International Status                View protocol            PST(Priority Setting Comments)  

Field Research DirectorExpediteTrial DelayField ID#RFCTO QAHQ RECD.Lab ID#Lab RECDLab CompProc. IDProc. ShippedProc. ReportRaw DataS Dir./Auditor
Seregin, Vladimir V Y 23-FL94 23-CAR14 MARCONI WSR
Seregin, Vladimir V Y 23-FL95 23-CAR14 MARCONI WSR
Seregin, Vladimir V 24-FL94 23-CAR14 MARCONI WSR
Seregin, Vladimir V 24-FL95 23-CAR14 MARCONI WSR

View Performance/Crop Safety Data

Field Research DirectorExpediteTrial DelayField ID#RFCTO QAHQ RECD.Lab ID#Lab RECDLab CompProc. IDProc. ShippedProc. ReportRaw DataS Dir./Auditor
Carrillo, D. P 24-FLP07 -NONE AXTELL
  IR-4 Help Desk: Phone number: 919-515-1552 Email: ir-4_project@ncsu.edu
Contact Us   IR-4 Advisories/Training    Events    Links    Upload Files